Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 国产精品一区二区在线观看免费 | 亚洲国产精品久 | 国产精品久久久久久无遮挡 | 在线一二三区 | XXXX乌克兰高潮喷水 | 国产精品99久久久精品 | sewang官网首页 | 波多野结衣一区三区 | 国产大片免费久久 | 91社永久 | 福利视频网址 | 九色91popny蝌蚪新疆 | 毛片高清视频 | 欧美成人三级精品 | 中文字幕日韩经典 | 成人18视频在线观看 | 亚洲一区二区三区99 | 好吊妞国产欧美日韩免费观看网站 | 亚洲国产高清AV网站 | 国产偷伦视频片免费视频 | 亚洲国产日韩在线一区模特 | 特级黄色av | 国产无遮挡18禁无码网站免费 | 久久人人爽人人爽人人片AV东京热 | 99久久国产综合精品五月天 | 日韩精品一区二区三区在线视频 | 天堂新版在线 | 天堂中文在线免费观看 | 国产女人伦码一区二区三区不卡 | 九九爱精品 | 希岛爱理在线 | 有码av在线 | 91黄视频| 顶级毛片| 91大神精品视频 | 欧美亚洲一本 | 亚洲九九夜夜 | 久久精品男人 | 中文字幕二三区 | 人人澡超碰碰一区二区三区不卡 | 一区二区三区中文 |